Please use this identifier to cite or link to this item: http://localhost:80/xmlui/handle/123456789/1353
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFarooq, Adil-
dc.contributor.authorAli, Umair-
dc.contributor.authorShinwari, Awais Khan-
dc.contributor.authorAshfaq ur Rehman-
dc.contributor.authorAhmed, Suhail-
dc.contributor.authorMehmood, Khizer-
dc.contributor.authorIqbal, Waseem-
dc.date.accessioned2019-11-15T09:50:51Z-
dc.date.available2019-11-15T09:50:51Z-
dc.date.issued2018-09-10-
dc.identifier.isbn978-1-5386-7027-9-
dc.identifier.urihttp://142.54.178.187:9060/xmlui/handle/123456789/1353-
dc.description.abstractIn order to maintain the efficiency of any power system, there is a strict need for its continuous monitoring. The supply and the demand gap is corrected as well as the outages rectified within the specific timeframe. In order to accomplish this task, SCADA (Supervisory Control and Data Acquisition) systems are implemented. This study is conducted for capital territory of Pakistan. The capital city Islamabad is divided into different regions and their output results are estimated. The covers the impact of the SCADA systems and their implementation for Islamabad. Simulation results are conducted for the AC voltage and the AC current signs in the power systems and corresponding conclusions are devised.en_US
dc.language.isoen_USen_US
dc.publisherIEEE International Conference on Power Generation Systems and Renewable Energy Technologies (PGSRET)en_US
dc.subjectEngineering and Technologyen_US
dc.subjectData acquisitionen_US
dc.subjectPower distributionen_US
dc.subjectSCADA systemsen_US
dc.titleSCADA Based Power Management and Distribution System Prototype for Pakistan Scenarioen_US
dc.typeProceedingsen_US
Appears in Collections:Proceedings

Files in This Item:
File Description SizeFormat 
8686023.htm115 BHTMLView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.