Please use this identifier to cite or link to this item:
http://localhost:80/xmlui/handle/123456789/14912
Title: | RECOMMENDED STANDARD OPERATING PROCEDURES FOR SSGC FUTURE GAS PIPELINE PROJECTS |
Authors: | Coating chemistry Cathodic Disbondment Resistance Butt, Professor Dr. Muhammad Arif Khan, Professor Dr. ljaz Hussain Ahmad, Professor Dr. Javaid Butt, Engr. Akbar Niaz Ahmad, Dr. Rafiq Inam, Engr. Aqil Majeed, Engr. Usman |
Keywords: | 3-layer FBE/PE coating Blast cleaning methods Polyethylene Coating Corrosion performance |
Issue Date: | 2007 |
Publisher: | UNIVERSITY OF THE PUNJAB, |
URI: | http://142.54.178.187:9060/xmlui/handle/123456789/14912 |
Appears in Collections: | PSF Funded Projects |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Recommeded Standard Operating Procedures for SSGC Future Gas Pipeline Projects.pdf | 365.93 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.