Title: PERFORMANCE IMPROVEMENT OF DIAPHRAGM WALL AT HIGH RISE BUILDING BY VALUE ENGINEERING UTILIZATION
Authors: Husin, Albert Eddy
Keywords: Engineering and Technology
Value engineering
Diaphragm wall
Cost optimization
Issue Date: 20-Sep-2019
Publisher: Asian Research Publishing Network
Abstract: Diaphragm Wall (D-Wall) is a retaining wall which is also used for basement floor walls which are part of a lower structure which contributes 8% of the total cost of high-rise building construction is a job that has a high enough level of difficulty so that it has the potential to experience cost overrun. According to World Bank data that 63% of 1,778 projects experienced Over-run Cost Value Engineering (VE) used to produce more efficient and effective costs and time so as to increase profit and revenue for contractors and owners. Statistical analysis uses the Relative Importance Index (RII) method to get the ranking of the 10 most influential factors on cost savings including: Location, Picture completeness and specification, Cost efficiency, Improving function value, Better project value, Mature planning, Hole ground collapse drill, Low productivity tools, Cost Model and price fluctuations. From the results of the study Analysis of the case study obtained cost optimization of 18.83%.
URI: http://142.54.178.187:9060/xmlui/handle/123456789/930
ISSN: 1819-6608
Appears in Collections:Journals

Files in This Item:
File Description SizeFormat 
jeas_0919_7932.htm146 BHTMLView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.